Climbing System - List of Manufacturers, Suppliers, Companies and Products

Climbing System Product List

1~3 item / All 3 items

Displayed results

Formwork scaffolding / Perimeter panel climbing system 'PERI RCS'

Construction kit system for various projects requiring self-elevating technology.

The "PERI RCS Rail Climbing System" is a climbing system that serves as a formwork-integrated scaffold and self-climbing protection panel. There are two methods of climbing: one using a crane and the other using a movable hydraulic device instead of a crane, allowing for selection based on the construction requirements. Additionally, the climbing formwork-integrated scaffold comes standard with a carriage equipped with push-pull support. 【Product Features】 ■ Safe rail-guided procedure - The moving unit is always connected to the building by climbing shoes. ■ Flexible installation - Climbing shoes can be attached to walls and slab edges. ■ Variable assembly - The arrangement of 125mm holes in the climbing rail allows the platform to be adjusted to the height of each floor. *For more details, please refer to the PDF materials or feel free to contact us.

  • rcs_mbe_22022013_back_rp_optimized.jpg
  • image_07.png
  • image_04.png
  • image_05.png
  • PERI_Logo_woR_RGB_30x15mm_300dpi_Office_User_digital_no_paper.jpg
  • Formwork material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large scaffolding/formwork automatic climbing system 'PERI ACS'

Construction kit system for various works requiring self-elevating technology.

The "PERI ACS Automatic Climbing System" is an integrated climbing system that serves as a self-climbing working scaffold and a large formwork panel system. 【Product Features】 ■ It is possible to climb with an integrated system of working scaffold and large formwork. ■ It uses hydraulic cylinders (rising 4 to 6 meters in about 20 minutes per batch). ■ Climbing is possible on both the outer side and the hollow of bridge piers. ■ Formwork can be safely and easily constructed and stripped on the main stage. ■ By placing the formwork on a carriage that can move back and forth on the stage, construction and stripping work for each concrete pouring batch can be performed safely and efficiently. *For more details, please refer to the PDF document or feel free to contact us.

  • 05022013_mbe_ACS_02_back.jpg
  • 05022013_mbe_ACS_Sonder.jpg
  • PERI_Logo_woR_RGB_30x15mm_300dpi_Office_User_digital_no_paper.jpg
  • Systems Architecture

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Climbing System "AR Bouldering"

New Sensation Experience Content: AR × Bouldering

"AR Bouldering" is a full-fledged climbing system that creates responsive content based on the player's movements, offering a new way to enjoy the game. It can be set up in a space of 5m x 5m and a height of 3.3m. It can also be conducted as bouldering without using AR. Additionally, the game content and difficulty can be adjusted according to the target audience, making it enjoyable for people of all ages. 【Game Contents】 ■ WHACK-A-BAT ■ CLIMBALL ■ SPARKS ■ ASTORMANIA ■ SHADOWLINGS, etc. *For more details, please download the PDF or feel free to contact us.

  • Sports related facilities
  • VR/AR

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration